Nuclear Power Plant Security and Vulnerabilities Updated January 3 2014 Congressional Research Service https crsreports congress gov RL34331 Nuclear Power Plant Security and Vulnerabilities Summary The physical security of nuclear power plants and their vulnerability to deliberate acts of terrorism was elevated to a national security issue following the attacks of September 11 2001 Congress subsequently enacted new nuclear plant security requirements and has repeatedly focused attention on regulation and enforcement by the Nuclear Regulatory Commission NRC More than a decade after the 9 11 attacks security at nuclear plants remains an important concern The Energy Policy Act of 2005 EPACT05 P L 109-58 imposed specific criteria for NRC to consider in revising the “Design Basis Threat” DBT which specifies the maximum severity of potential attacks that a nuclear plant’s security force must be capable of repelling In response to the legislative mandate NRC revised the DBT 10 C F R Part 73 1 on April 18 2007 Among other changes the revisions expanded the assumed capabilities of adversaries to operate as one or more teams and attack from multiple entry points To strengthen nuclear plant security inspections EPACT05 required NRC to conduct “force-onforce” security exercises at nuclear power plants at least once every three years In these exercises a mock adversary force from outside a nuclear plant attempts to penetrate the plant’s vital area and simulate damage to a “target set” of key safety components During calendar year 2012 NRC conducted 23 force-on-force FOF inspections at 22 commercial nuclear plants and one fuel cycle facility Eleven of those inspections found performance deficiencies 19 with low significance green findings one “greater than green” finding and three severity level IV least serious violations One exercise resulted in the simulated destruction of or damage to a complete “target set” of vital plant components that were under mock attack When force-on-force exercises indicate inadequate protection against the DBT additional security measures must be promptly implemented according to NRC Nuclear power plant vulnerability to deliberate aircraft crashes has been a continuing issue After much consideration NRC published final rules on June 12 2009 to require all new nuclear power plants to incorporate design features that would ensure that in the event of a crash by a large commercial aircraft the reactor core would remain cooled or the reactor containment would remain intact and radioactive releases would not occur from spent fuel storage pools NRC rejected proposals that existing reactors also be required to protect against aircraft crashes such as by adding large external steel barriers deciding that other mitigation measures already required by NRC for all reactors were sufficient In 2002 NRC ordered all nuclear power plants to develop strategies to mitigate the effects of large fires and explosions that could result from aircraft crashes or other causes NRC published a broad final rule on nuclear reactor security March 27 2009 including fire mitigation strategies and requirements that reactors establish procedures for responding to specific aircraft threats Other ongoing nuclear plant security issues include the vulnerability of spent fuel pools which hold highly radioactive nuclear fuel after its removal from the reactor standards for nuclear plant security personnel and nuclear plant emergency planning NRC’s March 2009 security regulations addressed some of those concerns and included a number of other security enhancements Congressional Research Service Nuclear Power Plant Security and Vulnerabilities Contents Overview of Reactor Security 1 Design Basis Threat 2 Large Aircraft Crashes 4 Spent Fuel Storage 6 Force-on-Force Exercises 7 Emergency Preparedness and Response 9 Cybersecurity 10 Plant Security Personnel 11 Overview of NRC Actions after 9 11 11 Selected Legislation in the 113th Congress 12 H R 1700 Engel 12 H R 3354 Engel 12 Contacts Author Information 13 Acknowledgments 13 Congressional Research Service Nuclear Power Plant Security and Vulnerabilities Overview of Reactor Security Physical security at nuclear power plants involves the threat of radiological sabotage—a deliberate act against a plant that could directly or indirectly endanger public health and safety through exposure to radiation The Nuclear Regulatory Commission NRC establishes security requirements at U S commercial nuclear power plants based on its assessment of plant vulnerabilities to and the consequences of potential attacks The stringency of NRC’s security requirements and its enforcement program have been a significant congressional issue especially since the September 11 2001 terrorist attacks on the United States While NRC establishes security requirements within the boundaries of commercial nuclear sites the Department of Homeland Security DHS has broad responsibility for coordinating government-wide efforts to prevent and respond to terrorist attacks including attacks on nuclear power plants DHS works with NRC and other agencies to protect nuclear facilities and other critical infrastructure 1 Nuclear plant security measures are designed to protect three primary areas of vulnerability controls on the nuclear chain reaction cooling systems that prevent hot nuclear fuel from melting even after the chain reaction has stopped and storage facilities for highly radioactive spent nuclear fuel U S plants are designed and built to prevent dispersal of radioactivity in the event of an accident by surrounding the reactor in a steel-reinforced concrete containment structure However as the March 2011 Fukushima disaster in Japan demonstrated reactor containments cannot completely block radioactive releases under the most severe circumstances such as when cooling systems are disabled for several hours or longer NRC requires commercial nuclear power plants to have a series of physical barriers and a trained security force under regulations already in place prior to the 9 11 attacks 10 C F R 73—Physical Protection of Plants and Materials The plant sites are divided into three zones an “ownercontrolled” buffer region a “protected area ” and a “vital area ” Access to the protected area is restricted to a portion of plant employees and monitored visitors with stringent access barriers The vital area is further restricted with additional barriers and access requirements The security force must comply with NRC requirements on pre-hiring investigations and training 2 A fundamental concept in NRC’s physical security requirements is the design basis threat DBT which establishes the severity of the potential attacks that a nuclear plant’s security force must be capable of repelling The DBT includes such characteristics as the number of attackers their training and the weapons and tactics they could use Specific details are classified Critics of nuclear plant security have contended that the DBT should be strengthened to account for potentially larger and more sophisticated terrorist attacks Reactor vulnerability to deliberate aircraft crashes has also been a major concern since 9 11 Most existing nuclear power plants were not specifically designed to withstand crashes from large jetliners although analyses differ as to the damage that could result NRC has determined that commercial aircraft crashes are beyond the DBT but published regulations in June 2009 to require that new reactor designs be able to withstand such crashes without releasing radioactivity Nuclear power critics have called for retrofits of existing reactors as well Since the 9 11 attacks NRC and Congress have taken action to increase nuclear power plant security NRC issued a series of security measures beginning in 2002 including a strengthening 1 Homeland Security Presidential Directive 7 Critical Infrastructure Identification Prioritization and Protection December 17 2003 http www dhs gov xabout laws gc_1214597989952 shtm#1 2 General NRC requirements for nuclear power plant security can be found in 10 C F R 73 55 Congressional Research Service RL34331 · VERSION 12 · UPDATED 1 Nuclear Power Plant Security and Vulnerabilities of the DBT and establishing the Office of Nuclear Security and Incident Response NSIR The office centralizes security oversight of all NRC-regulated facilities coordinates with law enforcement and intelligence agencies and handles emergency planning activities In 2004 NRC implemented a program to conduct “force on force” security exercises overseen by NSIR at each nuclear power plant at least every three years The Energy Policy Act of 2005 P L 109-58 required NRC to further strengthen the DBT codified the force-on-force program and established a variety of additional nuclear plant security measures In March 2009 NRC published a series of security regulations that require power plants to prepare cybersecurity plans develop strategies for dealing with the effects of aircraft crashes strengthen access controls improve training for security personnel and implement other new security measures Design Basis Threat The design basis threat describes general characteristics of adversaries that nuclear plants and nuclear fuel cycle facilities must defend against to prevent radiological sabotage and theft of strategic special nuclear material NRC licensees use the DBT as the basis for implementing defensive strategies at specific nuclear plant sites through security plans safeguards contingency plans and guard training and qualification plans General requirements for the DBT are prescribed in NRC regulations 3 while specific attributes of potential attackers such as their weapons and ammunition are contained in classified adversary characteristics documents ACDs Fundamental policies on nuclear plant security threats date back to the Cold War In 1967 the Atomic Energy Commission AEC instituted a rule that nuclear plants are not required to protect against an attack directed by an “enemy of the United States ”4 That so-called “Enemy of the State Rule” specifies that nuclear power plants are not required to provide for design features or other measures for the specific purpose of protection against the effects of a attacks and destructive acts including sabotage directed against the facility by an enemy of the United States whether a foreign government or other person or b use or deployment of weapons incident to U S defense activities 5 The Nuclear Regulatory Commission NRC the AEC’s successor regulatory agency says that the rule “was primarily intended to make clear that privately-owned nuclear facilities were not responsible for defending against attacks that typically could only be carried out by foreign military organizations ”6 NRC’s initial DBT established in the late 1970s was intended to be consistent with the enemy of the state rule which remains in effect However the 9 11 attacks drew greater attention to the potential severity of credible terrorist threats Following the attacks NRC evaluated the extent to which nuclear plant security forces should be able to defend against such threats and ordered a strengthening of the DBT along with other security measures on April 29 2003 That order changed the DBT to “represent the largest 3 10 C F R §73 1 It was feared that Cuba might launch an attack on Florida reactors Government Accountability Office Nuclear Power Plants—Efforts Made to Upgrade Security but the Nuclear Regulatory Commission’s Design Basis Threat Process Should Be Improved GAO-06-388 March 2006 p 2 Regulations at 10 CFR 50 13 5 10 C F R §50 13 Attacks and destructive acts by enemies of the United States and defense activities 6 Nuclear Regulatory Commission “Design Basis Threat ” 72 Federal Register 12714 March 19 2007 4 Congressional Research Service RL34331 · VERSION 12 · UPDATED 2 Nuclear Power Plant Security and Vulnerabilities reasonable threat against which a regulated private guard force should be expected to defend under existing law ” according to the NRC announcement 7 In the Energy Policy Act of 2005 EPACT05 Congress imposed a statutory requirement on the NRC to initiate rulemaking for revising the design basis threat 8 EPACT05 required NRC to consider 12 factors in revising the DBT such as an assessment of various terrorist threats the potential use of substantial explosive devices and modern weapons attacks by persons with sophisticated knowledge of facility operations and attacks on spent fuel shipments NRC approved its final rule amending the DBT 10 C F R Part 73 1 on January 29 2007 effective April 18 2007 9 Although specific details of the revised DBT were not released to the public in general the final rule clarifies that physical protection systems are required to protect against diversion and theft of fissile material expands the assumed capabilities of adversaries to operate as one or more teams and attack from multiple entry points assumes that adversaries are willing to kill or be killed and are knowledgeable about specific target selection expands the scope of vehicles that licensees must defend against to include water vehicles and land vehicles beyond the four-wheel-drive type revises the threat posed by an insider to be more flexible in scope and adds a new mode of attack from adversaries coordinating a vehicle bomb assault with another external assault The DBT final rule excluded aircraft attacks as beyond the reasonable responsibility of a private security force a decision that raised considerable controversy In approving the rule NRC rejected a petition from the Union of Concerned Scientists to require that nuclear plants be surrounded by aircraft barriers made of steel beams and cables the so-called “beamhenge” concept Critics of NRC’s final rule charged that deliberate aircraft crashes were a highly plausible mode of attack given the events of 9 11 However NRC contended that power plants were already required to mitigate the effects of aircraft crashes and that “active protection against airborne threats is addressed by other federal organizations including the military ”10 Additional NRC action on aircraft threats is discussed in the next section NRC Commissioners in January 2009 rejected a proposal by the NRC staff to strengthen the classified portion of the DBT to include additional capabilities by potential attackers according to news reports The staff proposal lost in a 2-2 vote with one commissioner position vacant Critics contend that the DBT excludes major types of weapons used by terrorists such as rocketpropelled grenades and is generally not based on the maximum credible threat identified by the intelligence community 11 7 Federal Register May 7 2003 vol 68 no 88 NRC All Operating Power Reactor Licensees Order Modifying Licenses 8 P L 109-58 Title VI Subtitle D—Nuclear Security Sections 651-657 Section 651 adds Atomic Energy Act Section 170E Design Basis Threat Rulemaking 9 Federal Register March 19 2007 vol 72 no 52 NRC Design Basis Threat Final Rule pp 12705-12727 10 NRC “NRC Approves Final Rule Amending Security Requirements ” News Release No 07-012 January 29 2007 11 Edwin S Lyman “Security Since September 11th ” Nuclear Engineering International March 2010 pp 14-19 Congressional Research Service RL34331 · VERSION 12 · UPDATED 3 Nuclear Power Plant Security and Vulnerabilities Critics of NRC’s security regulations also have pointed out that licensees are required to employ only a minimum of 10 security personnel on duty per plant which they argue is not enough for the job 12 Nuclear spokespersons have responded that the actual security force for the nation’s 65 nuclear plant sites numbers more than 5 000 an average of about 75 per site covering multiple shifts The industry also points out that nuclear plants all have integrated communications and emergency response plans that include local state and federal security forces The integrated response by outside security forces is intended to handle attacks that might overwhelm an individual plant’s security force 13 Large Aircraft Crashes Nuclear power plants were designed to withstand hurricanes earthquakes and other extreme events But deliberate attacks by large airliners loaded with fuel such as those that crashed into the World Trade Center and Pentagon were not analyzed when design requirements for today’s reactors were determined 14 Concern about aircraft crashes was intensified by a taped interview shown September 10 2002 on the Arab TV station al-Jazeera which contained a statement that Al Qaeda initially planned to include a nuclear plant in its list of 2001 attack sites In light of the possibility that an air attack might penetrate the containment structure of a nuclear plant or a spent fuel storage facility some interest groups have suggested that such an event could be followed by a meltdown or spent fuel fire and widespread radiation exposure Nuclear industry spokespersons have countered by pointing out that relatively small low-lying nuclear power plants are difficult targets for attack and have argued that penetration of the containment is unlikely and that even if such penetration occurred it probably would not reach the reactor vessel Fires and explosions caused by an aircraft crash outside the reactor containment could disable systems required to cool the reactor core and spent fuel pools and post-9 11 NRC regulations require nuclear plants to be able to mitigate such effects According to former NRC Chairman Nils Diaz NRC studies which have not been released “confirm that the likelihood of both damaging the reactor core and releasing radioactivity that could affect public health and safety is low ”15 However groups critical of nuclear power consider NRC’s mitigation requirements for fires and explosions to be insufficient to protect against aircraft crashes 16 NRC proposed in October 2007 to amend its regulations to require newly designed power reactors to take into account the potential effects of the impact of a large commercial aircraft 17 As discussed in the previous section NRC considers an aircraft attack to be beyond the design basis threat that plants must be able to withstand so the requirements of the proposed rule were 10 C F R 73 55 k 5 ii states “The number of armed responders shall not be less than ten 10 ” The previous requirement in 10 C F R 73 55 h 3 stated “The total number of guards and armed trained personnel immediately available at the facility to fulfill these response requirements shall nominally be ten 10 unless specifically required otherwise on a case by case basis by the Commission however this number may not be reduced to less than five 5 guards ” The change was made in NRC final regulations published in March 2009 op cit 13 Doug Walters “Security Since March ” Nuclear Engineering International May 2010 14 Meserve Richard A NRC Chairman “Research Strengthening the Foundation of the Nuclear Industry ” Speech to Nuclear Safety Research Conference October 29 2002 15 Letter from NRC Chairman Nils J Diaz to Secretary of Homeland Security Tom Ridge September 8 2004 16 Committee to Bridge the Gap Nuclear Information and Resource Service and Public Citizen “NRC Votes Against Requiring Reactors to be Protected from Air Attacks or Large Numbers of Attackers ” press release January 29 2007 http www committeetobridgethegap org pressrelease 012907release html 17 Federal Register October 3 2007 vol 72 no 191 Consideration of Aircraft Impacts for New Nuclear Power Reactor Designs 12 Congressional Research Service RL34331 · VERSION 12 · UPDATED 4 Nuclear Power Plant Security and Vulnerabilities intended to provide an additional margin of safety The proposed rule was drafted to affect only new reactor designs not previously certified by NRC because the previous designs were still considered adequately safe Nevertheless Westinghouse submitted changes in the certified design of its AP1000 reactor to NRC on May 29 2007 proposing to line the inside and outside of the reactor’s concrete shield building with steel plates to increase resistance to aircraft penetration 18 Under NRC’s 2007 proposed rule applicants for new certified designs or for new reactor licenses using uncertified designs would have been required to assess the effects that a large aircraft crash would have on the proposed facilities Each applicant would then describe how the plant’s design features capabilities and operations would avoid or mitigate the effects of such a crash particularly on core cooling containment integrity and spent fuel storage pools In response to comments the NRC staff proposed in October 2008 that the aircraft impact assessments be conducted by all new reactors including those using previously certified designs 19 The NRC Commissioners in a 3-1 vote approved the change February 17 2009 20 and it was published in the Federal Register June 12 2009 21 The new rule added specific design requirements that all new reactors must meet Each applicant subject to this section shall perform a design-specific assessment of the effects on the facility of the impact of a large commercial aircraft Using realistic analyses the applicant shall identify and incorporate into the design those design features and functional capabilities to show that with reduced use of operator actions A the reactor core remains cooled or the containment remains intact and B spent fuel cooling or spent fuel pool integrity is maintained As noted above NRC rejected proposals that existing reactors—in addition to new reactors—be required to protect against aircraft crashes such as by adding “beamhenge” barriers NRC determined that damage from aircraft crashes at existing reactors would be sufficiently mitigated by measures that had already been required at all reactors In 2002 NRC ordered all nuclear power plants to develop strategies to mitigate the effects of large fires and explosions that could result from aircraft crashes or other causes 22 As part of a broad security rulemaking effort NRC proposed in October 2006 to incorporate the 2002 order on fire and explosion strategies into its security regulations 10 CFR Part 73 23 In response to comments NRC published a supplemental proposed rule in April 2008 to move the fire and explosion requirements into its reactor licensing regulations at 10 CFR Part 50 along with requirements that reactors establish procedures for responding to specific aircraft threat notifications 24 Those regulations received final approval by MacLachlan Ann “Westinghouse Changes AP1000 Design to Improve Plane Crash Resistance ” Nucleonics Week June 21 2007 19 Nuclear Regulatory Commission Final Rule—Consideration of Aircraft Impacts for New Nuclear Power Reactors Rulemaking Issue Affirmation SECY-08-0152 October 15 2008 20 Nuclear Regulatory Commission Final Rule—Consideration of Aircraft Impacts for New Nuclear Power Reactors Commission Voting Record SECY-08-0152 February 17 2009 21 Nuclear Regulatory Commission Consideration of Aircraft Impacts for New Nuclear Power Reactors Final Rule 74 Federal Register 28111 June 12 2009 This provision is codified at 10 CFR 50 150 22 Nuclear Regulatory Commission Final Rule—Consideration of Aircraft Impacts for New Nuclear Power Reactors Rulemaking Issue Affirmation SECY-08-0152 October 15 2008 p 2 23 Nuclear Regulatory Commission “Power Reactor Security Requirements Proposed Rule ” 71 Federal Register 62664 October 26 2006 24 Nuclear Regulatory Commission “Power Reactor Security Requirements Supplemental Proposed Rule ” 73 Federal Register 19443 April 10 2008 18 Congressional Research Service RL34331 · VERSION 12 · UPDATED 5 Nuclear Power Plant Security and Vulnerabilities the NRC Commissioners December 17 2008 25 and were published in the Federal Register March 27 2009 26 A key provision in the new rule states Each licensee shall develop and implement guidance and strategies intended to maintain or restore core cooling containment and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire to include strategies in the following areas i Fire fighting ii Operations to mitigate fuel damage and iii Actions to minimize radiological release 27 Spent Fuel Storage When no longer capable of efficiently sustaining a nuclear chain reaction highly radioactive “spent” nuclear fuel is removed from the reactor and stored in a pool of water in the reactor building and at many sites later transferred to dry casks on the plant grounds Because both types of storage are located outside the reactor containment structure particular concern has been raised about the vulnerability of spent fuel to attack by aircraft or other means If terrorists could breach a spent fuel pool’s concrete walls and drain the cooling water or disable cooling systems so that cooling water evaporated the spent fuel’s zirconium cladding could overheat and catch fire The National Academy of Sciences NAS released a report in April 2005 that found that “successful terrorist attacks on spent fuel pools though difficult are possible ” and that “if an attack leads to a propagating zirconium cladding fire it could result in the release of large amounts of radioactive material ” NAS recommended that the hottest spent fuel be interspersed with cooler spent fuel to reduce the likelihood of fire and that water-spray systems be installed to cool spent fuel if pool water were lost The report also called for NRC to conduct more analysis of the issue and consider earlier movement of spent fuel from pools into dry storage 28 NRC agreed with some of findings of the NAS study but disagreed in several areas In a report to Congress in response to the NAS report NRC stated In summary the NRC believes based on information developed in NRC vulnerability assessments that the Committee has identified some scenarios that are unreasonable The NRC also disagrees with some NAS recommendations and its conclusion lacks a sound technical basis The NAS finding that earlier movement of spent fuel from pools into dry storage would be prudent is one such example 29 NRC conducted the site-specific analyses recommended by NAS with funding provided by the FY2006 Energy and Water Development Appropriations Act P L 109-103 H Rept 109-275 Nuclear Regulatory Commission “NRC Approves Final Rule Expanding Security Requirements for Nuclear Power Plants ” press release December 17 2008 http www nrc gov reading-rm doc-collections news 2008 08-227 html 26 Nuclear Regulatory Commission Power Reactor Security Requirements Final Rule 74 Federal Register 13925 March 27 2009 27 10 CFR 50 54 hh 2 28 National Academy of Sciences Board on Radioactive Waste Management Safety and Security of Commercial Spent Nuclear Fuel Storage Public Report online version released April 6 2005 29 U S Nuclear Regulatory Commission Report to Congress on the National Academy of Sciences Study on the Safety and Security of Commercial Spent Nuclear Fuel Storage March 2005 p iii http www nrc gov reading-rm doccollections congress-docs correspondence 2005 domenici-03142005 pdf 25 Congressional Research Service RL34331 · VERSION 12 · UPDATED 6 Nuclear Power Plant Security and Vulnerabilities NRC’s March 2009 regulations cited above include “spent fuel pool cooling capabilities” as a function that must be addressed by nuclear plants’ mitigation strategies for large fires and explosions Protection of spent fuel cooling also is included in the design requirements for new reactors under NRC’s June 2009 aircraft impact regulations When the Fukushima accident raised additional concern about spent fuel pool vulnerability NRC staff examined whether further studies should be conducted on expediting the transfer of spent fuel into dry storage The staff reported to the Commission on November 12 2013 that “the expedited transfer of spent fuel to dry cask storage would provide only a minor or limited safety benefit and that its expected implementation costs would not be warranted ”30 The November 2013 study was based partly on an NRC analysis of spent fuel pool earthquake vulnerability released in October 2013 The October analysis said that spent fuel in a pool that was drained could be hot enough to catch fire during the first few months after being removed from the reactor After that period the spent fuel would have cooled too much to ignite according to the study Overall the risk to the public from spent fuel pool damage was found to be extremely low However several comments to the October study including from the New York attorney general’s office contended that NRC had underestimated the spent fuel pool accident risk 31 NRC has long contended that the potential effects of terrorist attacks are not “reasonably foreseeable” impacts that must be included in environmental studies for proposed spent fuel storage and other nuclear facilities However the U S Court of Appeals for the 9th Circuit ruled in June 2006 that terrorist attacks must be included in the environmental study of a dry storage facility at California’s Diablo Canyon nuclear plant NRC reissued the Diablo Canyon study May 29 2007 to comply with the court ruling but it did not include terrorism in other recent environmental studies outside the jurisdiction of the 9th Circuit 32 The U S Court of Appeals for the 3rd Circuit subsequently ruled that NRC did not have to consider the impact of terrorist attacks in the license renewal application for the Oyster Creek plant in New Jersey 33 Long-term management of spent nuclear fuel is currently undergoing review but spent fuel stored at reactor sites is expected to be moved eventually to central storage permanent disposal or reprocessing facilities For details see CRS Report RL33461 Civilian Nuclear Waste Disposal by Mark Holt Large-scale transportation campaigns would increase public attention to NRC transportation security requirements and related security issues Force-on-Force Exercises EPACT05 codified an NRC requirement that each nuclear power plant conduct security exercises every three years to test its ability to defend against the design basis threat In these “force-onforce” exercises closely monitored and evaluated by NRC a mock adversary force from outside the plant attempts to penetrate the plant’s vital area and simulate damage to a “target set” of key 30 Satorius Mark A NRC executive director for operations memo to NRC commissioners COMSECY-13-0030 November 12 2013 http www nrc gov reading-rm doc-collections commission comm-secy 2013 20130030comscy pdf 31 NRC Office of Nuclear Regulatory Research Consequence Study of a Beyond-Design-Basis Earthquake Affecting the Spent Fuel Pool for a U S Mark I Boiling Water Reactor October 2013 http pbadupws nrc gov docs ML1325 ML13256A342 pdf 32 Beattie Jeff “NRC Takes Two Roads on Terror Review Issue ” Energy Daily February 27 2007 33 U S Court of Appeals for the Third Circuit New Jersey Department of Environmental Protection v U S Nuclear Regulatory Commission March 31 2009 http www ca3 uscourts gov opinarch 072271p pdf Congressional Research Service RL34331 · VERSION 12 · UPDATED 7 Nuclear Power Plant Security and Vulnerabilities safety components Actual damage to such components could result in radioactive releases from the plant Participants in the tightly controlled exercises carry weapons modified to fire only blanks and laser bursts to simulate bullets and they wear laser sensors to indicate hits Other weapons and explosives as well as destruction or breaching of physical security barriers may also be simulated While one squad of the plant’s guard force is participating in a force-on-force exercise another squad is also on duty to maintain normal plant security Plant defenders know that a mock attack will take place sometime during a specific period of several hours but they do not know what the attack scenario will be Multiple attack scenarios are conducted over several days of exercises Full implementation of the force-on-force program began in late 2004 Standard procedures and other requirements have been developed for using the force-on-force exercises to evaluate plant security and as a basis for taking regulatory enforcement action Many tradeoffs are necessary to make the exercises as realistic and consistent as possible without endangering participants or regular plant operations and security NRC required the nuclear industry to develop and train under NRC standards a “composite adversary force” made up of security officers from many plants to simulate terrorist attacks in all force-on-force exercises conducted after October 2004 However in September 2004 testimony the Government Accountability Office GAO criticized the industry’s selection of Wackenhut now G4S Regulated Security Solutions a security company that guards many U S nuclear plants to manage the adversary force including non-Wackenhut employees In addition to raising “questions about the force’s independence ” GAO noted that Wackenhut had been accused of cheating on previous force-on-force exercises by the Department of Energy 34 Exelon terminated its security contracts with Wackenhut in late 2007 after guards at the Peach Bottom reactor in York County PA were discovered sleeping while on duty 35 EPACT05 requires NRC to “mitigate any potential conflict of interest that could influence the results of a force-on-force exercise as the Commission determines to be necessary and appropriate ” NRC prohibits officers in the adversary force from participating in exercises at their home plants As in previous years NRC’s 2012 annual security report to Congress found that the industry adversary teams “continued to meet expectations for a credible well-trained mock adversary force ”36 During calendar year 2012 NRC conducted 23 force-on-force FOF inspections at 22 commercial nuclear plants and one fuel cycle facility Eleven of those inspections found performance deficiencies 19 with low significance green findings one “greater than green” finding and three severity level IV least serious violations One exercise resulted in the simulated destruction of or damage to a complete “target set” of vital plant components that were under mock attack GAO “Nuclear Regulatory Commission Preliminary Observations on Efforts to Improve Security at Nuclear Power Plants ” Statement of Jim Wells Director Natural Resources and Environment to the Subcommittee on National Security Emerging Threats and International Relations House Committee on Government Reform September 14 2004 p 14 35 Washington Post “Executive Resigns in Storm Over Sleeping Guards ” January 10 2008 36 Nuclear Regulatory Commission Office of Nuclear Security and Incident Response Report to Congress on the Security Inspection Program for Commercial Power Reactor and Category 1 Fuel Cycle Facilities Results and Status Update Annual Report for Calendar Year 2012 NUREG-1885 Rev 6 July 2013 p 11 http pbadupws nrc gov docs ML1321 ML13210A062 pdf 34 Congressional Research Service RL34331 · VERSION 12 · UPDATED 8 Nuclear Power Plant Security and Vulnerabilities According to NRC “Any significant deficiencies in the protective strategy identified during FOF exercises are promptly reviewed and corrected ” If a complete target set is simulated to be destroyed or damaged “compensatory measures ” such as extra security patrols are required until permanent solutions can be implemented Usually “compensatory measures will be put in place before the NRC inspection team leaves the site area ” Follow-up force-on-force exercises are sometimes conducted to verify that the necessary security improvements have been made 37 Emergency Preparedness and Response After the 1979 accident at the Three Mile Island nuclear plant near Harrisburg PA Congress required that all nuclear power plants be covered by emergency plans NRC requires each plant to have an Emergency Planning Zone EPZ with an approximately 10-mile radius Within the 10mile EPZ the plant operator must maintain warning systems and evacuation plans Every two years each plant must conduct full-scale emergency response exercises that are evaluated by NRC and the Federal Emergency Management Agency FEMA Within 50 miles of each plant plans must be in place to prevent the ingestion of radioactive material after an accident such as through bans on contaminated food and water 38 In light of heightened concern about terrorist attacks since 9 11 proposals have been made to expand the EPZ to include larger population centers NRC determined that the 10-mile EPZ remained adequate but it issued a bulletin in July 2005 identifying enhancements for emergency response plans in the case of “security-based events at a nuclear power plant ”39 The Fukushima disaster raised further questions about the adequacy of the 10-mile EPZ particularly because the Fukushima evacuation zone extended as far as 25 miles from the plant 40 An NRC task force on Fukushima did not recommend expansion of the EPZ concluding that emergency planning “enhancements” should be evaluated as additional information becomes available 41 The potential release of radioactive iodine during a nuclear incident is a particular concern because iodine tends to concentrate in the thyroid gland of persons exposed to it Emergency plans in many states include distribution of iodine pills to the population within the EPZ Taking non-radioactive iodine before exposure would prevent absorption of radioactive iodine but would afford no protection against other radioactive elements In 2002 NRC began providing iodine pills to states requesting them for populations within the 10-mile EPZ NRC completed one of its final regulatory responses to the 9 11 attacks by issuing wide-ranging revisions to its emergency preparedness regulations on November 23 2011 The changes include requirements that plant staff with emergency duties not have potentially interfering responsibilities that hostile actions be included as a type of emergency that requires plant coordination with local state and federal agencies that emergency plans include protection of 37 NRC Report to Congress on the Security Inspection Program op cit p 9 NRC “Emergency Preparedness Response ” web page December 19 2013 http www nrc gov about-nrc emergpreparedness html 39 NRC Office of Nuclear Security and Incident Response Emergency Preparedness and Response Actions for Security-Based Events NRC Bulletin 2005-02 July 18 2005 http www nrc gov reading-rm doc-collections gencomm bulletins 2005 bl200502 pdf 40 Japanese Ministry of Economy Trade and Industry “Restricted Areas and Areas to Which Evacuation Orders Have Been Issued ” May 7 2013 http www meti go jp english earthquake nuclear roadmap pdf 130507_assistance pdf 41 NRC Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Recommendations for Enhancing Reactor Safety in the 21st Century July 12 2011 pp 60-61 http pbadupws nrc gov docs ML1118 ML111861807 pdf 38 Congressional Research Service RL34331 · VERSION 12 · UPDATED 9 Nuclear Power Plant Security and Vulnerabilities plant personnel from hostile action and that hostile actions be included in emergency preparedness drills Some non-security changes were also included such as a requirement that evacuation time estimates be updated after every census or whenever major population changes occur 42 Cybersecurity Existing U S nuclear power reactors designed in the 1960s and ’70s are controlled primarily by analog systems that are resistant to cyberattack However new reactors are being designed with digital controls and existing analog plants increasingly rely on digital computers to run auxiliary and monitoring systems This increasing use of digital systems in nuclear power plants along with post 9 11 security concerns and at least one “worm” infection at a U S reactor 43 have prompted increased NRC attention to cybersecurity A year after the 9 11 attacks NRC issued an order that included cyberattacks among the threats that nuclear plants would be required to defend against Additional guidance for dealing with cyber threats was released during the next several years and NRC issued formal cybersecurity regulations in March 2009 “Protection of Digital Computer and Communications Systems and Networks ” 10 CFR 73 54 NRC published a regulatory guide for the program in January 2010 44 NRC’s cybersecurity regulations require each nuclear power plant to submit a cybersecurity plan and implementation schedule The plan must provide “high assurance” that digital computer and communications systems that perform the following functions will provide adequate protection against design basis attacks Functions that are safety-related or important to safety Security functions Emergency preparedness functions including offsite communications and Support systems and equipment that if compromised would adversely affect safety security or emergency preparedness functions NRC began inspecting the implementation of nuclear plant cybersecurity plans in January 2013 The inspections are part of NRC’s Cyber Security Oversight Program which is being incorporated into the existing Reactor Oversight Program 45 Nuclear power plants are also required by the Federal Energy Regulatory Commission FERC to comply with cybersecurity standards issued by the North American Electric Reliability Corporation NERC However nuclear plant computer systems that are covered by NRC security regulations are exempt from the NERC standards As a result the NERC standards apply mostly to “balance of plant” non-reactor systems at nuclear power plants 46 NRC “Enhancements to Emergency Preparedness Regulations ” final rule Federal Register November 23 2011 p 72560 43 Kesler Brent “The Vulnerability of Nuclear Facilities to Cyber Attack ” Strategic Insights spring 2001 p 15 http www nps edu Academics Centers CCC Research-Publications StrategicInsights 2011 Apr SI-v10-i1_Kesler pdf 44 NRC “Cyber Security Programs for Nuclear Facilities ” Regulatory Guide 5 71 January 2010 http pbadupws nrc gov docs ML0903 ML090340159 pdf 45 NRC Report to Congress on the Security Inspection Program op cit p 7 46 Federal Energy Regulatory Commission “Mandatory Reliability Standards for Critical Infrastructure Protection Order Addressing Compliance Filing and Approving Implementation Plan ” Docket No RM06-22-011 March 18 42 Congressional Research Service RL34331 · VERSION 12 · UPDATED 10 Nuclear Power Plant Security and Vulnerabilities Plant Security Personnel After video recordings of inattentive security officers at the Peach Bottom PA nuclear power plant were aired on local television an NRC inspection in late September 2007 confirmed that there had been multiple occasions on which multiple security officers were inattentive 47 However after a follow-up inspection into security issues at the Peach Bottom plant run by Exelon Nuclear the NRC concluded that the plant’s security program had not been significantly degraded as a result of the guards’ inattentiveness NRC issued a bulletin December 12 2007 requiring all nuclear power plants to provide written descriptions of their “managerial controls to deter and address inattentiveness and complicity among licensee security personnel ”48 The incident drew harsh criticism from the House Committee on Energy and Commerce “The NRC’s stunning failure to act on credible allegations of sleeping security guards coupled with its unwillingness to protect the whistleblower who uncovered the problem raises troubling questions ” said Representative John D Dingell then-Chairman of the Committee 49 NRC proposed a $65 000 fine on Exelon Nuclear on January 6 2009 50 NRC modified its standards for plant security personnel as part of a major revision of its security regulations published March 27 2009 described in the next section The standards cover education and training requirements criminal background checks and mental and physical qualifications 51 Overview of NRC Actions after 9 11 Following the 9 11 terrorist attacks NRC conducted a “top-to-bottom” review of its nuclear power plant security requirements On February 25 2002 the agency issued “interim compensatory security measures” to deal with the “generalized high-level threat environment” that continued to exist and on January 7 2003 it issued regulatory orders that tightened nuclear plant access On April 29 2003 NRC issued orders to restrict security officer work hours establish new security force training and qualification requirements and increase the DBT that nuclear security forces must be able to defend against as discussed previously In October 2006 NRC proposed to amend the security regulations and add new security requirements that would codify the series of orders issued after 9 11 and respond to requirements in the Energy Policy Act of 2005 52 The new security regulations were approved by the NRC Commissioners on December 17 2008 and published March 27 2009 53 2010 http www nerc com files CIP_ImplementationOrder-03182010 pdf 47 NRC NRC Commences Follow-up Security Inspection at Peach Bottom November 5 2007 http www nrc gov reading-rm doc-collections news 2007 07-057 i html 48 NRC Security Officer Attentiveness NRC Bulletin 2007-1 Washington DC December 12 2007 49 Committee on Energy and Commerce Energy and Commerce Committee to Probe Breakdowns in NRC Oversight January 7 2008 http energycommerce house gov Press_110 110nr149 shtml 50 NRC “NRC Proposes $65 000 Fine for Violations Associated with Inattentive Security Guards at Peach Bottom Nuclear Plant ” press release January 6 2009 http www nrc gov reading-rm doc-collections news 2009 09001 i html 51 10 Code of Federal Regulations Part 73 Appendix B—General Criteria for Security Personnel http www nrc gov reading-rm doc-collections cfr part073 part073-appb html 52 Federal Register October 26 2006 vol 71 no 207 NRC Power Reactor Security Requirements Proposed Rule 53 Federal Register March 27 2009 op cit Congressional Research Service RL34331 · VERSION 12 · UPDATED 11 Nuclear Power Plant Security and Vulnerabilities Safety and Security Interface Explicit requirements were established for nuclear plants to ensure that necessary security measures do not compromise plant safety Mixed-Oxide Fuel Enhanced physical security requirements were established to prevent theft or diversion of plutonium-bearing mixed-oxide MOX fuel Cybersecurity Nuclear plants must submit security plans that describe how digital computer and communications systems and safety-related networks are protected from cyberattacks as discussed in the cybersecurity section above Aircraft Attack Mitigative Strategies and Response As discussed in the earlier section on vulnerability to aircraft crashes nuclear plants must prepare strategies for responding to warnings of an aircraft attack and for mitigating the effects of large explosions and fires Plant Access Authorization Nuclear plants must implement more rigorous programs for authorizing access including enhanced psychological assessments and behavioral observation Security Personnel Training and Qualification Modifications to security personnel requirements include additional physical fitness standards increased minimum qualification scores for mandatory personnel tests and requirements for on-the-job training Physical Security Enhancements New requirements are intended to ensure the availability of backup security command centers uninterruptible power supplies to detection systems enhanced video capability and protection from waterborne vehicles A proposal by NRC staff to release more details about the results of nuclear plant security inspections was defeated by the NRC Commissioners in a 2-2 vote on January 21 2009 Under current policy NRC announces after a security inspection whether any violations that were found were of low safety significance or moderate-or-higher safety significance Critics of the current policy contend that the public needs more detail to be assured of plant security The policy’s supporters counter that greater information about security inspection findings could inadvertently provide useful information to terrorists 54 Selected Legislation in the 113th Congress H R 1700 Engel Nuclear Disaster Preparedness Act Requires the President in consultation with the Secretary of Energy the Secretary of Defense the Administrator of the Environmental Protection Agency the Nuclear Regulatory Commission the Secretary of Homeland Security and the Administrator of the Federal Emergency Management Agency to issue guidance on federal response to nuclear disasters resulting from terrorism and other causes Introduced April 24 2013 referred to Committee on Transportation and Infrastructure H R 3354 Engel Dry Cask Storage Act Requires spent fuel at nuclear power plants to be moved from spent fuel pools to dry casks after it has sufficiently cooled Costs of the fuel transfers would be offset by a 54 Jenny Weil “Commissioners Reach Stalemate on Security-Related Amendment ” Inside NRC February 2 2009 Congressional Research Service RL34331 · VERSION 12 · UPDATED 12 Nuclear Power Plant Security and Vulnerabilities reduction in nuclear waste fees owed to the federal government Introduced October 28 2013 referred to Committee on Energy and Commerce Author Information Mark Holt Specialist in Energy Policy Acknowledgments Former CRS specialist Anthony Andrews was a co-author of this report Disclaimer This document was prepared by the Congressional Research Service CRS CRS serves as nonpartisan shared staff to congressional committees and Members of Congress It operates solely at the behest of and under the direction of Congress Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has been provided by CRS to Members of Congress in connection with CRS’s institutional role CRS Reports as a work of the United States Government are not subject to copyright protection in the United States Any CRS Report may be reproduced and distributed in its entirety without permission from CRS However as a CRS Report may include copyrighted images or material from a third party you may need to obtain the permission of the copyright holder if you wish to copy or otherwise use copyrighted material Congressional Research Service RL34331 · VERSION 12 · UPDATED 13
OCR of the Document
View the Document >>